Removing-Refitting: Load safety bar

RELAY III · Repair procedures · Removal-fitting · Reference C4AG013MP0

ESSENTIAL : Observe the safety and cleanliness recommendations. 1. Removing Figure : c4ag1uad Remove : The bolts (1), (3), (4) The fixing ring (5) The load retainer (2) 2. Refitting Proceed in the reverse order to removal.

Open in the interactive documentation

Other languages: Français · Deutsch · Español · Italiano