Operating the equipment: heating/ventilation
XM II · Repair procedures · Draining - filling - bleeding · Reference C5HI03P0
1. Putting a charging station into service Follow the safety instructions. Ascertain that the taps of the charging station are closed. Check the oil level of the vacuum pump (see the relevant operation). Figure : c5hp01np Connect the reservoir (K) to the tap (8). Bleed the charging station (when…